Didn't
make it to the September Project Linus work day but a request for
quilts from a head start program came in last week. They requested 22 boy and
11 girl blankets. The PL slave driver coordinator
thought we should make some strip quilts. My machine was in the shop last week,
but I pulled some of my kid friendly fabric and other strips putting
together 3 kits for myself. 48 hours later, my machine was back,
sewing so smooth and I was busy.
These went together so quickly, pillow casing and only quilting in the ditch. I using a wavy stitch
Favorite has to be this wild fabric with the monkeys.
It has been hot here, 90's, cooler tonight, tomorrow, low 80s.
No comments:
Post a Comment